Statistics cases were filtered out of the case lists used by the grid calculator, both in the variable table and in the Select Result dialog. Statistics cases belonging to a grid ensemble were also missing from RimProject::allGridCases(), as only the source cases of the ensemble were collected. Statistics cases in a grid case group were already included.
A statistics case can be used as source only. A calculated result stored in a statistics case is interpreted as computed statistics, and would block recomputation of the statistics, so a statistics case is never assigned as destination case.
A statistics case with no computed statistics is not necessarily opened. Make sure source cases are opened before grid dimensions are validated and before result data is read.
* Use full name for grid case view
* FIx signed / unsigned issue
* Support drag/drop of file names into Main Window
* Add function to check if two grid cases are of equal size
* Result Info: Show cell result text for all linked views
* Improve how to specify cells to be included in calculation
- move view filter to calculation
- improve how to assign values to non-visible cells
- avoid computation between grids of different size
Closes#9482
* Main Window: add three dock widgets for splitting project tree
* Main Window: move scripts to separate tree widget
* Add eclipse result addresses to data source project tree.
* Grid Calculator: drag-and-drop for calculation variables.
* Grid Calculator: rename to 'Grid Property Calculator'.