Joakim Hove
|
dc318f731f
|
Rename ConnectionSet > WellConnections
|
2018-06-20 11:35:11 +02:00 |
|
Joakim Hove
|
3975db2ff3
|
Rename CompletionSet -> ConnectionSet
|
2018-06-11 14:03:32 +02:00 |
|
Kai Bao
|
e76df698c6
|
changing the counting of the schecule in SCHEDULE_WELLS2
basically, all the control keywords should be combined with the
TSTEP/DATES afterwards as a complete report step.
|
2018-02-14 09:09:27 +01:00 |
|
Kai Bao
|
3c8c65b65c
|
not turning of injector because of defaulted rates.
it must be a limit to turn it off. The old implementation make it
impossible to have a injector with only bhp control.
|
2018-02-12 12:27:44 +01:00 |
|
Kai Bao
|
35ecd2e37a
|
fixing WCONHIST.
|
2018-01-06 21:49:27 +01:00 |
|
Joakim Hove
|
612e255d4f
|
Extracted Schedule and SummaryConfig,
|
2017-10-24 09:27:42 +02:00 |
|
Tor Harald Sandve
|
eb4f0b68d6
|
Fix shut well logic when WELOPEN and COMPDAT is combined
Do not shut well if all completions are shut using WELOPEN but new
completions are opened using COMPDAT in the same time step.
|
2017-10-03 08:26:09 +02:00 |
|
Joakim Hove
|
4b3c06cbcc
|
Fixed bug in time dependence of RFT configuration.
|
2017-09-08 23:33:52 +02:00 |
|
Joakim Hove
|
1050b8cba9
|
Added operator<< suppport for Deckxxx
|
2017-08-30 16:57:23 +02:00 |
|
Joakim Hove
|
bfca3e895c
|
Moved integration tests.
|
2017-06-27 09:47:15 +02:00 |
|