it is for WellCollection, which is logically wrong. It should be done in
the group level, while things will be different for multi-level groups.
The current implementation basically works for current needs, that we
only have one group.
forced and only_group basically mean two opposite things. Having both of
them in the same context will be really confusing and error-prone.
And also, we do not do anything forcedly. We do things base on what
setup tells us to do.
Only_group may not be the final name, while deinitely a better one than
forced.
For the WellModel from the simulator to use. Not decided totally,
well_collection might need to be updated during the simualtion due
to the update the target of wells.
Current understanding. Two ways might prevent to return the guide_rate here
1. preventing the well from group control with keyword WGRUPCON
2. the well violating some limits and working under limits. We do not have strategy
to handle this situation yet.
Very hacky way here. The logic of the code is that only
a well is specified under GRUP control, it is under group
control. Which is not the case observed from the result.
From the result, if we specify group control with GCONPROD
and WCONPROD for a well, it looks like the well will be
under group control. TODO: make the logic correct here
instead of using `false` here.
since the unit code within opm-parser is now a drop-in replacement,
this simplifies things and make them less error-prone.
unfortunately, this requires quite a few PRs. (most are pretty
trivial, though.)
This reverts commit 09205dfa074af24b381595d02c15e799523ddb2b.
We cannot use the index as it might change for a well between different
report steps. Unfortunately the only persistent way to identify wells
over all report steps in the schedule seems to be the well name.
Before this commit we tried to compute whether a well is represented on
the processor using the grid information. Due to the overlap region and
possible completion on deactivated cells of the global grid this is not
even possible. E.g. we cannot distinguish whether a completion is just
not represented on the domain of a process or the corresponding cell is
not active in the simulation.
With this commit we refactor to passing the well manager an explicit
list of name of wells that should be completely neglected. This information
can easily by computed after the loadbalancer has computed partitions.
when well is closed due to rate economic limits, based on the auto
shut-in configuration, the well can be STOP or SHUT.
When well is closed due to all the connections are closed, it should be
SHUT.