opm-core/tests/testPinch1.DATA
2015-10-09 10:33:21 +08:00

282 lines
6.4 KiB
Plaintext

---------------------------------------------------------------------------
RUNSPEC
---------------------------------------------------------------------------
TITLE
MINPV and PINCH tests
METRIC
DIMENS
4 1 4 /
OIL
WATER
GAS
DISGAS
VAPOIL
EQLDIMS
1 100 10 1 1 /
TABDIMS
-- NTSFUN NTPVT NSSFUN NPPVT NTFIP NRPVT
1 1 41 12 1 12 /
WELLDIMS
-- MAX CONN WELLS IN
-- WELLS PR WELL GROUPS GROUP
2 20 1 2 /
START
1 'JAN' 2014 /
UNIFIN
UNIFOUT
-- Linear solver stack size
NSTACK
25 / -- Increased from 10 due to convergence problems
-- Increase the allowable amount of problem prints
MESSAGES
-- LIM1 LIM2 LIM3 LIM4 LIM5 LIM6 STOP1 STOP2 STOP3 STOP4 STOP5 STOP6
-- MESS COM WARN PROB ERR BUG MESS COM WARN PROB ERR BUG
2* 1000000 1000000 4* 1000000 1000000 /
---------------------------------------------------------------------------
GRID
---------------------------------------------------------------------------
DXV
4*5 /
DYV
1*5 /
DZV
4*5 /
TOPS
4*1000 /
/
-- In this section, the geometry of the simulation grid and the rock
-- permeabilities and porosities are defined.
INIT
-- ARRAY VALUE ------- BOX ------
EQUALS
-- DX 5 1 1 1 1 1 4 /
-- DX 5 2 2 1 1 1 4 /
-- DX 5 3 4 1 1 1 4 /
-- DY 5 1 4 1 1 1 4 /
-- DZ 5 1 4 1 1 1 4 /
-- TOPS 1000 1 1 1 4 1 1 / top layer
PERMX 1000 1 4 1 1 1 4 /
PORO 0.3 1 1 1 1 1 4 /
PORO 0.0000001 2 2 1 1 2 3 /
PORO 0.3 2 2 1 1 1 1 /
PORO 0.3 2 2 1 1 4 4 /
PORO 0.3 3 4 1 1 1 4 /
/
EQUALS
MULTZ 0.1 1 4 1 1 1 1 /
MULTZ 0.2 1 4 1 1 2 3 /
MULTZ 0.05 1 4 1 1 4 4 /
/
COPY
'PERMX' 'PERMY' /
'PERMX' 'PERMZ' /
/
PINCH
------- All default
0.001 'GAP' 1* 'TOPBOT' /
/
MINPV
------- All default
0.001
/
RPTGRID
COORD=1 ZCORN=1 TRANX TRANY TRANZ ALLNNC PORV MINPV PINCH DZ NNC /
--RPTINIT
-- AREAX AREAY AREAZ MULTX MULTY MULTZ MULTX- MULTY- MULTZ- TRANX TRANY TRANZ NTG DZ /
PROPS ======
PVTO
-- Rs Pbub Bo Vo
0 1. 1.0000 1.20 /
20 40. 1.0120 1.17 /
40 80. 1.0255 1.14 /
60 120. 1.0380 1.11 /
80 160. 1.0510 1.08 /
100 200. 1.0630 1.06 /
120 240. 1.0750 1.03 /
140 280. 1.0870 1.00 /
160 320. 1.0985 .98 /
180 360. 1.1100 .95 /
200 400. 1.1200 .94
500. 1.1189 .94 /
/
PVTG
-- Pg Rv Bg Vg
100 0.0001 0.010 0.1
0.0 0.0104 0.1 /
200 0.0004 0.005 0.2
0.0 0.0054 0.2 /
/
SWOF
0.1 0.0 1.0 0.9
0.2 0.0 0.8 0.8
0.3 0.1 0.6 0.7
0.4 0.2 0.4 0.6
0.7 0.5 0.1 0.3
0.8 0.6 0.0 0.2
0.9 0.7 0.0 0.1
/
SGOF
0.0 0.0 1.0 0.2
0.1 0.0 0.7 0.4
0.2 0.1 0.6 0.6
0.8 0.7 0.0 2.0
0.9 1.0 0.0 2.1
/
PVTW
--RefPres Bw Comp Vw Cv
1. 1.0 4.0E-5 0.96 0.0 /
ROCK
--RefPres Comp
1. 5.0E-5 /
/
DENSITY
-- Oil Water G
1000 1000 0.82 /
---------------------------------------------------------------------------
REGIONS
---------------------------------------------------------------------------
EQUALS
-- VAL ------- BOX ------
SATNUM 1 /
PVTNUM 1 /
/
---------------------------------------------------------------------------
SOLUTION
---------------------------------------------------------------------------
-- The solution section defines the initial state of the solution
-- variables (phase pressures, saturations, and gas-oil ratios)
-- Equilibration data specification
--EQUIL
-- DEPTH PRES OW CONTACT
-- (m) (bar) (m)
-- 1000 210 1040 /
-- Initial water saturation for each grid cell
--EQUALS
SWAT
16*0.1 /
SGAS
16*0.1 /
PRESSURE
16*200 /
---------------------------------------------------------------------------
SUMMARY
---------------------------------------------------------------------------
ALL
-- This keyword requests that summary data be written to the Summary file
-- only at report times. The default, if the RPTONLY keyword is not
-- present (and it was not requested in a restart file), is to write the
-- summary information at every time step.
-- Otherwise, the summary file may grow very large.
RPTONLY
---------------------------------------------------------------------------
SCHEDULE
---------------------------------------------------------------------------
-- The schedule section defines the operations to be simulated
-- Controls on output to the RESTART file
RPTRST
BASIC=3 -- restart data written every FREQ time
FREQ=10 -- save every 10th report time
PCOW
TRANX
TRANY
TRANZ
/
WELSPECS
-- WELL GROUP LOCATION BHP PI
-- NAME NAME I J DEPTH DEFN
PROD 'G' 1 1 1000 'OIL' /
INJE 'G' 1 1 1000 'WATER' /
/
COMPDAT
-- WELL -LOCATION- OPEN/ SAT CONN WELL
-- NAME I J K1 K2 SHUT TAB FACT DIAM
PROD 4 1 1 1 'OPEN' 2* 0.1 /
INJE 1 1 1 1 'OPEN' 2* 0.1 /
/
---------------------------------------------------------------------------
-- CONTROL: PURE WATER INJECTION
---------------------------------------------------------------------------
WCONINJE
-- WELL INJ OPEN/ CNTL FLOW FLOW BHP
-- NAME TYPE SHUT MODE RATE LIMIT LIMIT
-- (m^3/day) (m^3/day) (bar)
INJE 'WATER' 'OPEN' 'RESV' 1* 1.0000e+00 1000000 /
/
WCONPROD
-- WELL OPEN/ CNTL OIL WATER GAS LIQU RES BHP
-- NAME SHUT MODE RATE RATE RATE RATE RATE LIMIT
-- (m^3/day) (bar)
PROD 'OPEN' 'RESV' 4* 1.0000e+00 /
/
TSTEP
1
/
---------------------------------------------------------------------------
END
---------------------------------------------------------------------------