First commit

This is the first model of SPE10
This commit is contained in:
lker 2015-08-12 10:16:31 +02:00
parent 8016f4d909
commit d87d7457db

View File

@ -0,0 +1,257 @@
-- This reservoir simulation is made available under the open Database
-- License: http://opendatacommons.org/licenses/odbl/1.0/
-- Individual contents of the database are licensed under the Database contents
-- License : http://opendatacommons.org/licenses/dbcl/1.0/
-- Copyright (C) 2015 Statoil
-- ===============================================================================
-- SPE 10 - MODEL 1
-- Simulation based on the followinf SPE paper:
-- "Tenth SPE comparative solution project: a comparison of upscaling techniques"
-- By Mike Christie (Heriot-Wat University) and Martin Blunt (Imperial College)
-- SPE, August 2001
-- ===============================================================================
RUNSPEC
TITLE
SPE10:TENTH SPE COMPARATIVE SOLUTION PROJECT: A COMPARISON OF UPSCALING TECHNIQUES - MODEL 1
DIMENS
100 1 20 /
NONNC
OIL
WATER
GAS
FIELD
EQLDIMS
1* 1* 1* /
TABDIMS
2 1 1* 1* 1 /
WELLDIMS
2 20 1 2 /
UNIFOUT
START
1 'FEB' 1967 /
NSTACK
25 /
-- =================================================
------- In theis section, the geometry of the simulation
------- grid and the rock perøeabilities, porosities are
------- defined.
-- =================================================
GRID
INIT
DX
2000*25 /
DY
2000*25 /
DZ
2000*2.5 /
INCLUDE
PERM_SPE10MODEL1.INC
/
EQUALS
PORO 0.2 1 100 1 1 1 20 /
TOPS 0 1 100 1 1 1 1 /
/
-- ========================================================================
PROPS
-- Sg Krg Kro Pcgo
SGOF
0.000000 0 1.000000 0.000000
0.025000 0 0.912530 0.000000
0.075000 0 0.752410 0.000000
0.125000 0.000007 0.611238 0.000000
0.175000 0.000093 0.488020 0.000000
0.225000 0.000501 0.381737 0.000000
0.275000 0.001760 0.291345 0.000000
0.325000 0.004800 0.215767 0.000000
0.350000 0.007416 0.183188 0.000000
0.375000 0.011065 0.153893 0.000000
0.425000 0.022631 0.104573 0.000000
0.475000 0.042315 0.066609 0.000000
0.525000 0.073794 0.038746 0.000000
0.575000 0.121716 0.019658 0.000000
0.625000 0.191818 0.007925 0.000000
0.675000 0.291038 0.001995 0.000000
0.725000 0.427631 0.000103 0.000000
0.775000 0.611280 0.000000 0.000000
0.825000 0.853215 0.000000 0.000000
0.85 1 0 0 / table 1
0 0 1 0
0.050000 0 0.830041 0.000000
0.100000 0.000001 0.679518 0.000000
0.150000 0.000031 0.547448 0.000000
0.200000 0.000232 0.432827 0.000000
0.250000 0.000977 0.334621 0.000000
0.300000 0.002980 0.251773 0.000000
0.350000 0.007416 0.183188 0.000000
0.400000 0.016028 0.127737 0.000000
0.450000 0.031250 0.084248 0.000000
0.475000 0.042315 0.066609 0.000000
0.500000 0.056314 0.051496 0.000000
0.550000 0.095367 0.028191 0.000000
0.600000 0.153590 0.012965 0.000000
0.650000 0.237305 0.004338 0.000000
0.700000 0.354093 0.000668 0.000000
0.750000 0.512909 0.000000 0.000000
0.800000 0.724196 0.000000 0.000000
0.850000 1.000000 0.000000 0.000000 / table 2
-- No water in the reservoir but Flow is a 3-phase simulator so water
-- is placed below the reservoir and has no impact on simulation
--Sw Krw Kro Pcgo
SWOF
0 0 1 0
0.200 0.0001 0.9999 0
0.250 0.0069 0.8403 0
0.300 0.0278 0.6944 0
0.350 0.0625 0.5625 0
0.400 0.1111 0.4444 0
0.450 0.1736 0.3403 0
0.500 0.2500 0.2500 0
0.550 0.3403 0.1736 0
0.600 0.4444 0.1111 0
0.650 0.5625 0.0625 0
0.700 0.6944 0.0278 0
0.750 0.8403 0.0069 0
0.800 1.0000 0.0000 0 /
/
-- Oil Dens Wat Dens Gas Dens
DENSITY
43.68 62.430 0.0624
/
-- NO WATER, BUT NEEDED FOR FLOW, TAKEN FROM MODEL2
-- REF PRES Bw WAT.COMP WAT.VISC
PVTW
6000 1 0.000003 0.3 /
-- Bo equals to one, fuids are uncompressible
-- Eclipse do not accept 2 identical Bo for diff pres.
-- Oil Pres Bo MUo
PVDO
95 1.0001 0.9999
100 1 1
105 0.9999 1.0001
/
-- Bg equals to 1 because the fluid is uncompressible
-- Eclipse cannot accept 2 identical values of Bg for diff pres.
-- Gas Phase Bg MUg
-- pressure
PVDG
95 1.0001 0.009999
100 1 0.01
105 0.9999 0.010001
/
--REF. PRES COMPRESSIBILITY - TAKEN FROM MODEL 2
ROCK
6000 0.000001
/
SOLUTION ==================================================
-- Datum Pres WOC Pcwoc GOC Pcgoc
EQUIL
0 100 50 0 0 0 /
SUMMARY ===================================================
RUNSUM
FOPT
FGPT
FOPR
FGPR
FGIR
FGIT
FPR
FOE
FGIR
WBHP
'INJ'
'PROD'
/
WPI
'INJ'
'PROD'
/
SCHEDULE ===================================================
RPTRST
'BASIC=4' /
WELSPECS
'INJ' G1 1 1 1.25 GAS /
'PROD' G1 100 1 1.25 OIL /
/
COMPDAT
'INJ' 1 1 1 20 OPEN 2* 2 /
'PROD' 100 1 1 20 OPEN 2* 2 /
/
WCONINJE
'INJ' GAS OPEN RATE 0.2461 1* 10000 /
/
WCONPROD
'PROD' OPEN BHP 5* 95 /
/
TSTEP
80*100 /
END