Rename the the meaning for shut as whats used in Eclipse.
STOP: Well stopped off above the formation. I.e. allow for flow in the
well.
SHUT: Well completely isolated from the formation. The well is removed
from the well list.
Shut wells are not added to the well list and the well index should
therefore not be increased when well control is set. This is similar to
whats is done for shut wells in createWellsFromSpecs.
Shut wells are not added to the well list and thus not considered in the
simulator.
The shut well test in test_wellsmanager is modified to assert this
behaviour.
BUG: This change provokes an assert in the EclipeWriter as number of
wells in wellstate is different from number of wells in the schedule.
For constant capillar pressure function the saturation is
determined by cell depths:
Sg_max, Sw_min
----- goc ----
Sg_min, Sw_min
----- woc ----
Sg_min, Sw_max
The pvt interface is extended to handle wet-gas systems:
1. rvSat is added as a function in the PVT interface
2. SinglePvtLiveGas computes the pvt values and its derivatives
3. The old rbub variable is changed to rsSat for clearity
4. The new interface is tested in test_blackoilfluid with data from
liveoil.DATA and wetgas.DATA
The second input of initBlackoilStateFromDeck that computes surface
volumes based on gas/oil ratio is changed from
BlackoilPropertiesInterface to Props. To avoid duplication with the old
initBlackoilStateFromDeck its name is changed to
initBlackoilSurfvolUsingRS.
Add new function is added that computes saturation from surface volumes
solving z = As for each cell. This function is used to compute an
intial guess to the saturations in initState_impl.hpp.