Simulator programs and utilities for automatic differentiation.
Go to file
Andreas Lauser 877eccb4cc reservoir problem: various improvements
- start with an initial "do nothing" episode of 100 days to get
  hydrostatic conditions.
- after that, produce oil and inject water for 900 days. (thereafter
  the reservoir will be empty.)
- make the problem work with element centered FV discretizations. this
  requires to make the width of the injection/production areas at
  least one cell wide. This is achieved by using the new "WellWidth"
  property which specifies the with of wells as a factor of the total
  domain width.
- make the problem work with fully compositional models. This implied
  to calculate the full composition for the fluid states which specify
  the initial condition and the thermodynamic state at the wells.
- add tests and reference solutions for any combination of the {ECFV,
  VCFV} discretizations and the {black-oil, NCP} models.
2016-01-05 11:54:27 +01:00
bin relax the python script to check the reference solutions 2013-07-07 19:02:28 +02:00
doc refactoring: rename GridCreator to GridManager 2014-04-27 19:12:32 +02:00
examples reservoir problem: various improvements 2016-01-05 11:54:27 +01:00
tests reservoir problem: various improvements 2016-01-05 11:54:27 +01:00