With the introduction of shut wells the same ordering in the well states
can no longer be assumed. The well names is instead used to map the old
well state to the new. Also the partial_copying is moved into the
initialization.
Tested on SPE1, SPE3, SPE9 and Norne. (Do not change the SPEs and is
nessesary for the Norne)
This fixes the following bugs:
- No longer overwrite the matlab-output files each step.
- Create output also for the initial state.
- Change filenames of matlab-output by one (initial state is 000.txt,
final state is NNN.txt and not (NNN-1).txt for total of NNN steps).
- Eclipse binary output matches eclipse output (includes the same
steps including initial state) for the same case.
Also added several comments outlining the parts of the run() function.
Total time will be written to walltime.txt, and single step times to
step_timing.txt (changed suffix from param to txt). This did not work
properly before this fix (step_timing file was overwritten each step).
When this kw is active, BlackoilPropsAdFromDeck now modifies rvSat
and rsSat curves cell-wise by a power of (sat_oil_cell /
sat_oil_cell_historical_max). Currently, the associated jacobians do
not reflect terms of type d/d_sat_oil, but code for doing this is given
as comments to BlackoilPropsAdFromDeck::applyVap(ADB& r, ...).
This commit introduces support for the RESV control mode of
prediction (WCONPROD) and history-matching (WCONHIST) alike. The
implementation uses class SurfaceToReservoirVoidage<> to compute
coefficients that convert component rates at surface conditions
(i.e., the primary degrees of freedom in the well residual) to phase
rates at reservoir condition. The resulting coefficients can be
entered directly into system matrix of the linearised residual.
Note: We abuse the "distr" mechanism of struct WellControls to store
the conversion coefficients. This may require refactorisation and
clarification at a later stage. In the meantime, it allows for
transparent assembly of well equations--irrespective of surface- or
reservoir (voidage) rates.
Note: We do not yet support injectors controlled by total reservoir
voidage rate--either in history-matching (WCONINJH) or
prediction-scenario capacity.